Mission SG Axion Q27 Nova 240
Uses less electricity than 17% of the 4,819 monitors, 24–31″ on the EU register. At your selected price (European Union) that is €11 a year, €106 over ten years.
- Power, SDR
- 25.7 W
- Typical 21 W
- Running cost
- €11 / year
- 4 h a day
- Power, HDR
- 69.1 W
- 2.7× SDR
Uses more than most comparable models: 83 % of them need less. Teamgee TG-S10 PRO, the most efficient alternative on sale, saves about €8 a year. 65% of comparable models reach a better class than F; the most common is E. In HDR it draws 69.1 W, 2.7 times its SDR power. Mission SG has 13 models in this group; this one is number 11 among them. Registered in Oct 2026, one of the newer models in its group.
Where it stands
Rank 3,946 of 4,819 monitors, 24–31″ by yearly consumption. 3,945 use less.
Next to it in the ranking
- LC-Power LC-M27-FHD-240-C 37 kWh −€0.03
- Philips 275B1H 37 kWh −€0.03
- Mission SG Axion Q27 Nova 240 38 kWh
- Alogic 27C5KPDTF 38 kWh same
- Alogic 27C5KPDWTF 38 kWh same
What it will cost you
| Period | Axion Q27 Nova 240 | TG-S10 PRO | Difference |
|---|---|---|---|
| 1 year | €11 | €2 | −€8 |
| 5 years | €53 | €11 | −€42 |
| 10 years | €106 | €22 | −€85 |
| 15 years | €159 | €32 | −€127 |
Is the more efficient model worth its price?
Enter both purchase prices to see the total cost of ownership.
Power in SDR and HDR
Cost by viewing time
| Use | kWh / yr | € / yr |
|---|---|---|
| 2 hours a day | 19 | €5 |
| 4 hours a day | 38 | €11 |
| 8 hours a day | 75 | €21 |
Same size, lower running cost
On sale, at least 10% less energy, same size group
| Model | kWh / yr | Saves / year |
|---|---|---|
| Mission SG Axion Q27 Nova 240 (this model) | 38 | — |
| 8 | €8 | |
| 10 | €8 | |
| 10 | €8 | |
| 10 | €8 | |
| 12 | €7 |
Label and product sheet
- Energy class SDR / HDR
- F / G
- On-mode power SDR
- 25.7 W
- On-mode power HDR
- 69.1 W
- Standby / networked standby
- 0.2 W
- Screen diagonal
- 27″
- Resolution
- 2560×1440
- Panel
- LED LCD
- Refresh rate
- 60 Hz
- Software updates (minimum)
- 8 years
- Guarantee (supplier)
- 5 years
- Spare parts (minimum)
- 7 years
Model numbers and history
Registered by Mission SG under one model number.
Axion Q27 Nova 240
- First published in the EU register (EPREL)
- Placed on the EU market
Questions
How much does the Mission SG Axion Q27 Nova 240 cost to run?
At 4 hours a day it uses about 38 kWh a year according to its EU energy label. At the EU average household price of 0.283 €/kWh that is about €11 a year, or €106 over ten years.
Does HDR use more electricity?
Yes. In HDR mode this screen draws 69.1 W instead of 25.7 W, 2.7 times as much. The yearly cost on this page uses SDR, as the label does.